Case Studies
Case Study

Case Studies

Below are various case studies of work undertaken by Industrial Cooling Equipment Ltd, which should provide an idea of the range and scope of the solutions that we offer.

Pharmaceutical Cold Room Extension

Wholesale client needed additional chilled storage capacity at their Birmingham depot to meet increasing demand.

View case study

Repairs to Laboratory Air Conditioning System

ICE were tasked with carrying out a deep clean of an air conditioning cassette system over a weekend, when the Laboratory was out of use.

View case study

Pharmaceutical Walk-In Chillstore

Our scope of works was to decommission and remove the problematic systems and sub-standard insulated enclosure, and to put aside for collection by the contractor that supplied it.

View case study

Deep Clean of a Wall Mounted Air Conditioning System

During a routine maintenance visit to a gaming company in Manchester, it was highlighted that the air flow coming from a wall mounted air conditioning unit was significantly reduced.

View case study

Large Refrigeration & Air Conditioning Project for Pharmaceutical Manufacturer

The feedback from the client on this projects was “superb and as we expected from ICE”.

View case study

ICE maintenance contract extends warranty on new equipment for up to 10 years

By partnering with ICE as the installer and the service provider to undertake the air conditioning maintenance, the client can extend the warranty on their equipment for up to 10 years.

View case study

Design & Build of Walk-In Chillstore

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

View case study

MHRA Chill Stores: 2°C to 8°C for Pharmaceuticals

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

View case study

Switching to Evaporative Cooling from DX AC

See how we saved our client, a food manufacturer that specialises in cooking sauces, over £9,000 a year in energy costs by replacing a traditional DX cooling system with evaporative cooling.

View case study