Industrial Cooling Equipment Ltd

Hooton Bio Power Station

Installation of 27 x Air Conditioning Systems

Location

Ellesmere Port

Date

March 2021

Value Range

£100K - £150k

Product Category

Air Conditioning Installation

See more case studies

ICE maintenance contract extends warranty on new equipment for up to 10 years

ICE Ltd the experts in Refrigeration & Air Conditioning, provide a case study of how a maintenance contract extends warranty of new equipment for up to 10 years.

Read More

Design & Build of Walk-In Chillstore

Design, supply & installation of Walk In Pharmaceutical Chillstore with an operating range of 2°C to 8°C.

Read More

MHRA Chill Stores: 2°C to 8°C for Pharmaceuticals

Design, supply & installation of multiple Walk In Pharmaceutical Chillstores, each with an operating range of 2°C to 8°C.

Read More

Switching to Evaporative Cooling from DX AC

See how we saved a food manufacturing client over £9,000 a year in energy costs

Read More

Pharma Cold Room Emergency Call Out

ICE Ltd the experts in Refrigeration, provide a case study of an “Out of Hours” refrigeration breakdown for a 2-8C Pharma Coldroom.

Read More

Installing AC in Three New Server Rooms

Our longstanding pharmaceutical client required cooling to three server rooms at their new state of the art distribution facility in Wakefield.

Read More

Hooton Bio Power is a brand new waste recycling facility built in Ellesmere Port, Cheshire. The facility processes 240,000 tonnes of waste per annum and generate 25.2 MW of electricity which is exported to the grid after the facility’s own power needs are met. The power station recycles generates electricity for 50,000 homes in the area.

Cooling was required to several sensitive control room areas, with high heatloads throughout of the power station.

Scope of work

Heatloads on this project were provided by the client so equipment had to be selected to meet the requirements.

The client requested single split systems so that should a system fail or require servicing, the remaining units within the area/room would still maintain the desired temperature.

How ICE helped

The installation of 27 Daikin inverter driven single split systems of varying duty from 3.5kW to 25kW were installed across the Power Station. In one Low Voltage control room alone, 150kW of cooling was installed and all controlled and monitored by the sites BMS system.

This project run by our Head of Projects Lee Hopkins and was installed using several in house teams. Work was carried out in stages over a 6 month period and completed and commissioned in Spring 2021.

Results

Due to the complex installation and a tight programme of works, ICE excelled an delivered the project on time during periods where over 2500 other contractors were on site of varying skillsets and industries from all over Europe.

The European construction company were impressed with our installation and our work ethics and have recently invited us back to carry out service work and discuss maintenance for the whole of the power station that falls under our expertise.

We are ready to help with your air conditioning, refrigeration and ventilation enquiries.

If you have an enquiry, please complete the contact form and our team will be in touch. We look forward to hearing from you and look forward to building a winning partnership

Get in touch today!

    By sending this message, you agree to the Terms of use and Privacy Policy.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.