Case Studies
Case Study

Case Studies

Below are various case studies of work undertaken by Industrial Cooling Equipment Ltd, which should provide an idea of the range and scope of the solutions that we offer.

Server Room’s New AC & Leak Detection System Installation

Our longstanding client, a healthcare manufacturer based in North Wales, required cooling to their new Server Room. As part of expansion plans for the North Wales site, a new Server Room was being built with critical equipment within the room that required temperature control.

View case study

MHRA Chill Store for Pharmaceutical Supplier

Design, supply & installation of Walk In Pharmaceutical Chillstore with an operating range of 2°C to 8°C

View case study

New Air Conditioning to Car Detailing Workshop

ICE undertook an air conditioning installation project for a national car detailing company.

View case study

Air Conditioning Maintenance Contract, Duni Group Cheshire

Provide an air conditioning maintenance contract and reactive breakdown assistance to their head office facility

View case study

2°C to 8°C Chillstore for Pharmaceutical Distributor in Glasgow

A longstanding pharmaceutical client required a new chillstore at their Glasgow site. The site had an existing chillstores spread out across the site. The client required a new larger chillstore to combine the other which were to be removed and provide additional storage space.

View case study
Diamond Boxing Academy Aircon installation

New Air Conditioning to Diamond Kickboxing Academy

A national pharmaceutical wholesaler with coverage throughout the UK required a new chillstore at their St Albans site.

View case study

MHRA Temperature Controlled Warehouse for Pharmaceutical Distributor in York

A national pharmaceutical Distributor with a network of depots throughout the UK, required temperature control of the warehouse at their York Depot.

View case study

Chill Store for Pharmaceutical Wholesalers

A national pharmaceutical wholesaler with coverage throughout the UK required a new chillstore at their St Albans site.

View case study

Hooton Bio Power Station AC Project, Cheshire

Installation of 27 x Air Conditioning Systems

View case study